Wednesday, October 13, 2004

Update - Oceanside II-- Wednesday, Oct. 13

Update from Cindy Flood:

Oceanside II now has all of the trash and debris removed from the portico. The sand has been shoveled out and the area has been swept and hosed down. The crew also cleaned the catwalks on all of the floors today. The POA had crews cleaning the parking lot. Joanne was back in the office, but she still does not have phone service restored. Hill/York worked on the A/C units again today and we will reset A/C units Wednesday morning.

Important Notice From Marian Ream!!
Due to all the hurricane damage, the storage lockers on the ground floor both in the North and South Locker areas will have to be removed and replaced when renovation takes place. Anything that is in or above the lockers must be removed by this Friday, October 15. Unfortunately, most of the items in all of the storage bins will or has been discarded because of mold and mildew as a result of the water damage. We are planning on having a storage bin for some of the salvageable items but there is no guarantee what the items will be like as a result of being stored.

All of the work in the storage locker area must be completed before we can finally power wash and sanitize the ground floor. Please bear with us regarding this work as it is necessary before we can proceed restoring our building.

If anyone is removing items for friends, please do not place them on the balconies as we are having the balconies cleaned and this will only create more sand and dirt on the walkways and in the elevators.

Thank you for your cooperation.

*Please note that mold and mildew can be very infectious to some people. Please take special care when dealing with the exposed items.

0 Comments:

Post a Comment

<< Home